07.04.07 -THE ROOF AND STACK ARE PAINTED IN THEIR FINAL COLORS, WHICH ARE BLACK AND SILVER. - Kirk L. Warner (kwarner) Viewed: 2282 times.
|
07.07.07 - THE SIDING ON THE RIGHT SIDE IS NOW COMPLETE. - Kirk L. Warner (kwarner) Viewed: 2038 times.
|
07.07.07 - TARPAPER HAS BEEN ISNSTALLED OVER THE INSIDE OF THE SIDING PRIOR TO REAPPLICATION OF THE INTERIOR PLYWOOD. - Kirk L. Warner (kwarner) Viewed: 2053 times.
|
07.07.07 - THE INTERIOR PLYWOOD PANELS ON THE RIGHT SIDE AND THE BR INTERIOR CORNER HAVE BEEN REINSTALLED. THE UNPAINTED PORTION OF THE PLYWOOD IS WHERE THE DESK WILL BE REAPPLIED. - Kirk L. Warner (kwarner) Viewed: 2155 times.
|
| | | |
| | | |
|
|
|
|
|
07.08.07 - THE LAST OF THE INTERIOR WALL PLYWOOD HAS BEEN REAPPPLIED. THE BRIGHT GREEN PIECE OF PLYWOOD IN THE LOWER RIGHT OF THE PHOTO IS FOR THE CEILING. - Kirk L. Warner (kwarner) Viewed: 2054 times.
|
07.08.07 - THE ROTTED FLOORING ON THE RIGHT SIDE OF THE INTERIOR HAS BEEN REMOVED, AS WELL AS THE DIAMOND PLATE FROM THE DOOR AREA, WHICH IS STANDING IN THE RIGHT CORNER OF THE PHOTO. - Kirk L. Warner (kwarner) Viewed: 2097 times.
|
07.08.07 - HERE IS THE CONDITION OF THE FLOORING UNDER THE DIAMOND PLATE ON THE B END OF THE CAR INTERIOR. - Kirk L. Warner (kwarner) Viewed: 2080 times.
|
07.08.07 - THE TRIM ON THE LEFT SIDE WINDOW HAS BEEN APPLIED. - Kirk L. Warner (kwarner) Viewed: 2024 times.
|
| | | |
| | | |
|
|
|
|
|
07.12.07 - THE ROTTED WOOD AT THE DOOR ENTRANCE, SEEN IN PREVIOUS PHOTOS, HAS BEEN CUT OUT AND PATCHED IN WITH EXISTING WOOD PIECES. A METAL DIAMOND PLATE GOES OVER THE PATCHED IN SECTION OF THE FLOOR. NEW WOOD FLOORING INSTALLATION HAS COMMENCED. THE THRESHOLD STRIP WILL BE RENEWED AFTER THE NEW DOORS ARE HUNG. - Kirk L. Warner (kwarner) Viewed: 1978 times.
|
07.12.07 - AN INTERIOR VIEW OF THE NEW WOOD FLOORING BEING APPLIED. NOTE THE TARPAPER THAT HAS BEEN APPLIED OVER THE SUBFLOOR, PRIOR TO THE FINISH FLOORING APPLICATION. - Kirk L. Warner (kwarner) Viewed: 2057 times.
|
07.12.07 - THE LEFT SIDE OF THE CAR HAS FINSH PAINT COMPLETE AND IS READY FOR LETTERING, WHICH WILL COMMENCE SHORTLY. THE ROOF HAD ITS' SECOND COAT OF BLACK APPLIED TODAY AND IS NOW COMPLETE. - Kirk L. Warner (kwarner) Viewed: 2052 times.
|
07.15.07 - THE CEILING PANEL ON THE A END HAS BEEN REAPPLIED. THE BRIGHT GREEN COLOR IS WHAT THE ENTIRE INTERIOR WILL BE WHEN IT IS COMPLETED. - Kirk L. Warner (kwarner) Viewed: 2015 times.
|
| | | |
| | | |
|
|
|
|
|
07.15.07 - KIRK WARNER IS INSTALLING THE NEW SECTIONS OF FLOORING TO REPLACE THE DECAYED WOOD. - Kirk L. Warner (kwarner) Viewed: 2066 times.
|
07.15.07 - ALL OF THE NEW FLOOR PIECES HAVE BEEN INSTALLED AND VICTOR HUMPHREYS IS PRIMING THEM. - Kirk L. Warner (kwarner) Viewed: 2050 times.
|
07.15.07 - THE REPLACEMENT FLOORING AT THE B END DOOR THRESHOLD HAS BEEN INSTALLED, REPLACING THE ROTTED WOOD UNDER THE DIAMOND PLATE. - Kirk L. Warner (kwarner) Viewed: 2147 times.
|
08.05.07 - THE NUMBERS AND LETTERING HAVE BEEN APPLIED TO THE RIGHT SIDE OF THE UNDERFRAME. - Kirk L. Warner (kwarner) Viewed: 2026 times.
|
| | | |
| | | |
|
|
|
|
|
08.05.07 - THE LETTERING AND NUMBERS HAVE BEEN APPLIED TO THE LEFT SIDE OF THE CAR. - Kirk L. Warner (kwarner) Viewed: 2219 times.
|
08.08.07 - JOHN NELLIGAN, VICTOR HUMPHREYS, BOB KUTELLA AND KIRK WARNER , (NOT IN PHOTO) TAKE A SHORT BREAK FROM TRANSFERING THE OAK, PICKED UP BY KIRK WARNER AT THE SAWMILL. THE BOARDS ARE TO BE USED FOR THE DECKING ON BOTH ENDS OF THE CABOOSE. INSTALLATION WILL START ON 08.12.07 IF THERE IS NO RAIN AND THE WOOD DRYS ADEQUATELY. - Kirk L. Warner (kwarner) Viewed: 2175 times.
|
08.12.07 - KIRK WARNER IS CUTTING OFF THE OLD BOLTS PRIOR TO APPLYING THE NEW DECK BOARDS. ALL OF THE DECK BOARDS ON THE A END WERE CUT TO LENGTH BY KIRK WARNER AND MARK ST. GERMAIN. - Kirk L. Warner (kwarner) Viewed: 2052 times.
|
08.12.07 - MARK ST. GERMAIN STARTS TO STAIN THE NEW DECK BOARDS WHICH WERE PUT INTO PLACE BY KIRK WARNER AND MARK. - Kirk L. Warner (kwarner) Viewed: 2008 times.
|
| | | |