08.29.07 - THE MAJOR MISSING CEILING PANEL HAS BEEN MADE AND INSTALLED.  THERE ARE STILL THREE SMALL TRIM CEILING PANELS TO INSTALL.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - BOB KUTELLA APPLIES THE LATEST MARKING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - VICTOR HUMPHREYS COMPLETES THE FIRST COAT OF FINISH PAINT ON THE RIGHT SIDE OF THE CAR.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - VICTOR HUMPHREYS HAS NEEDLE CHIPPED, WIRE WHEELED, PRIMED AND FINISH PAINTED THE RIGHT SIDE OF THE A TRUCK OVER A TWO DAY PERIOD.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
08.29.07 - THE MAJOR MISSING CEILING PANEL HAS BEEN MADE AND INSTALLED. THERE ARE STILL THREE SMALL TRIM CEILING PANELS TO INSTALL. - Kirk L. Warner (kwarner)
Viewed: 1748 times.
09.02.07 - BOB KUTELLA APPLIES THE LATEST MARKING. - Kirk L. Warner (kwarner)
Viewed: 1721 times.
09.02.07 - VICTOR HUMPHREYS COMPLETES THE FIRST COAT OF FINISH PAINT ON THE RIGHT SIDE OF THE CAR. - Kirk L. Warner (kwarner)
Viewed: 1686 times.
09.02.07 - VICTOR HUMPHREYS HAS NEEDLE CHIPPED, WIRE WHEELED, PRIMED AND FINISH PAINTED THE RIGHT SIDE OF THE A TRUCK OVER A TWO DAY PERIOD. - Kirk L. Warner (kwarner)
Viewed: 1666 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 -  KIRK WARNER HAS COMPLETED THE INTERIOR APPLICATION OF ALL OF THE PLYWOOD.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - KIRK WARNER APPLIES THE TRIM TO THE A DOOR OF THE CABOOSE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - THE A DOOR HAS BEEN TRIMMED TO FIT AND IS TEMPORARILY SHIMMED IN PLACE UNTIL THE LOCKSET IS RECEIVED BACK FROM THE LOCKSMITH.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - VICTOR HUMPHREYS PRIMES THE TRIM, WHERE IT WAS CUT TO FIT, AND THE NAIL HEADS SECURING THE TRIM.  THE NEW A DOOR IS FIT INTO PLACE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.02.07 - KIRK WARNER HAS COMPLETED THE INTERIOR APPLICATION OF ALL OF THE PLYWOOD. - Kirk L. Warner (kwarner)
Viewed: 1690 times.
09.02.07 - KIRK WARNER APPLIES THE TRIM TO THE A DOOR OF THE CABOOSE. - Kirk L. Warner (kwarner)
Viewed: 1686 times.
09.02.07 - THE A DOOR HAS BEEN TRIMMED TO FIT AND IS TEMPORARILY SHIMMED IN PLACE UNTIL THE LOCKSET IS RECEIVED BACK FROM THE LOCKSMITH. - Kirk L. Warner (kwarner)
Viewed: 1641 times.
09.02.07 - VICTOR HUMPHREYS PRIMES THE TRIM, WHERE IT WAS CUT TO FIT, AND THE NAIL HEADS SECURING THE TRIM. THE NEW A DOOR IS FIT INTO PLACE. - Kirk L. Warner (kwarner)
Viewed: 1691 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - THE LETTERING ABOVE THE BL STEPS HAS BEEN APPLIED. THE OVERFLOW PIPE FROM THE HEATER FUEL TANK HAS ALSO BEEN APPLIED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.02.07 - WITH THE A END NOW COMPLETE, DICK CUBBAGE STARTS THE NEEDLE CHIPPING ON THE B END, WHICH IS NECESSARY BEFORE PAINTING AND STARTING THE APPLICATION OF THE NEW DECKING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.04.07 - THE TOPS OF THE SUPPORTS FOR THE DECKING HAVE BEEN NEEDLE CHIPPED, PRIMED AND FINISH PAINTED.  THE AR STAIRS HAVE BEEN DISASSEMBLED AND STRAIGHTENED ON THE HYDRAULIC PRESS.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.05.07 - THE NEW DECK WOOD HAS BEEN REMOVED FROM STORAGE ON TOP OF THE OLD, ROTTED DECKING, TAKEN INTO THE SHOP, CUT TO LENGTH AND BROUGHT BACK OUT TO THE CAR FOR STAINING.  THE OLD DECK BOARDS ARE BEING REMOVED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.02.07 - THE LETTERING ABOVE THE BL STEPS HAS BEEN APPLIED. THE OVERFLOW PIPE FROM THE HEATER FUEL TANK HAS ALSO BEEN APPLIED. - Kirk L. Warner (kwarner)
Viewed: 1680 times.
09.02.07 - WITH THE A END NOW COMPLETE, DICK CUBBAGE STARTS THE NEEDLE CHIPPING ON THE B END, WHICH IS NECESSARY BEFORE PAINTING AND STARTING THE APPLICATION OF THE NEW DECKING. - Kirk L. Warner (kwarner)
Viewed: 1641 times.
09.04.07 - THE TOPS OF THE SUPPORTS FOR THE DECKING HAVE BEEN NEEDLE CHIPPED, PRIMED AND FINISH PAINTED. THE AR STAIRS HAVE BEEN DISASSEMBLED AND STRAIGHTENED ON THE HYDRAULIC PRESS. - Kirk L. Warner (kwarner)
Viewed: 1632 times.
09.05.07 - THE NEW DECK WOOD HAS BEEN REMOVED FROM STORAGE ON TOP OF THE OLD, ROTTED DECKING, TAKEN INTO THE SHOP, CUT TO LENGTH AND BROUGHT BACK OUT TO THE CAR FOR STAINING. THE OLD DECK BOARDS ARE BEING REMOVED. - Kirk L. Warner (kwarner)
Viewed: 1653 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.05.07 - THE NEW DECK WOOD IS BEING STAINED.  (A MESSY JOB!  THE STAIN GOES EVERYWHERE!)
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.05.07 - THE FIRST FIVE PIECES OF NEW DECKING HAVE BEEN APPLIED.  THE REMAINDER OF THE DECK SUPPORT SYSTEM HAS TO BE NEEDLE CHIPPED AND PAINTED PRIOR TO APPLICATION OF MORE NEW DECKING.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.08.07 - MORE OF THE DECK SUPPORT AREA AND UNDERFRAME HAS BEEN NEEDLE CHIPPED AND PRIMED.  THE OLD TIMBER BOLTS ARE STILL IN PLACE AND MUST BE REMOVED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.08.07 - THE VERTICAL SUPPORTS FOR THE AR STEPS HAVE BEEN STRAIGHTENED, PAINTED AND TEMPORARILY BOLTED IN PLACE.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.05.07 - THE NEW DECK WOOD IS BEING STAINED. (A MESSY JOB! THE STAIN GOES EVERYWHERE!) - Kirk L. Warner (kwarner)
Viewed: 1659 times.
09.05.07 - THE FIRST FIVE PIECES OF NEW DECKING HAVE BEEN APPLIED. THE REMAINDER OF THE DECK SUPPORT SYSTEM HAS TO BE NEEDLE CHIPPED AND PAINTED PRIOR TO APPLICATION OF MORE NEW DECKING. - Kirk L. Warner (kwarner)
Viewed: 1697 times.
09.08.07 - MORE OF THE DECK SUPPORT AREA AND UNDERFRAME HAS BEEN NEEDLE CHIPPED AND PRIMED. THE OLD TIMBER BOLTS ARE STILL IN PLACE AND MUST BE REMOVED. - Kirk L. Warner (kwarner)
Viewed: 1753 times.
09.08.07 - THE VERTICAL SUPPORTS FOR THE AR STEPS HAVE BEEN STRAIGHTENED, PAINTED AND TEMPORARILY BOLTED IN PLACE. - Kirk L. Warner (kwarner)
Viewed: 1722 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.09.07 - KIRK WARNER AND VICTOR HUMPHREYS ARE BOLTING THE STRAIGHTENED AND PAINTED PARTS OF THE AR SILL STEPS TOGETHER.  IN THE BACKGROUND, THE HINGES TO THE A END DOOR WERE INSTALLED TODAY.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.09.07 - VICTOR HUMPHREYS APPLIES THE FINAL COAT OF PAINT TO THE COMPLETED AR STEPS.  INTERESTINGLY, WE HAVE PHOTO SHOWING THAT THE AR, BR AND BL STEPS WERE PAINTED MINERAL RED, WHILE THE AL STEPS WERE PAINTED YELLOW.  THE CAR WILL BE RETORED IN THAT MANNER.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.09.07 - ALL OF THE REMAINING OLD TIMBER BOLTS WERE CUT OFF. (QUITE A JOB!) THE UNDERFRAME AND DECK SUPPORT AREAS HAVE HAD THE FINISH COAT OF PAINT APPLIED AND THIS SECTION IS READY FOR MORE DECKING TO BE APPLIED.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
09.09.07 - KIRK WARNER HAS MADE THE PIECES TO HOLD THE RIGHT WINDOW PANE IN PLACE.  THE WINDOW GLASS IS NOW GASKETED, SECURED AND THE FRAME IS PAINTED, WITH A FIRST COAT OF FINISH PAINT, TO COMPLETE THE EXTERIOR OF THE RIGHT SIDE WINDOW.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
09.09.07 - KIRK WARNER AND VICTOR HUMPHREYS ARE BOLTING THE STRAIGHTENED AND PAINTED PARTS OF THE AR SILL STEPS TOGETHER. IN THE BACKGROUND, THE HINGES TO THE A END DOOR WERE INSTALLED TODAY. - Kirk L. Warner (kwarner)
Viewed: 1681 times.
09.09.07 - VICTOR HUMPHREYS APPLIES THE FINAL COAT OF PAINT TO THE COMPLETED AR STEPS. INTERESTINGLY, WE HAVE PHOTO SHOWING THAT THE AR, BR AND BL STEPS WERE PAINTED MINERAL RED, WHILE THE AL STEPS WERE PAINTED YELLOW. THE CAR WILL BE RETORED IN THAT MANNER. - Kirk L. Warner (kwarner)
Viewed: 1692 times.
09.09.07 - ALL OF THE REMAINING OLD TIMBER BOLTS WERE CUT OFF. (QUITE A JOB!) THE UNDERFRAME AND DECK SUPPORT AREAS HAVE HAD THE FINISH COAT OF PAINT APPLIED AND THIS SECTION IS READY FOR MORE DECKING TO BE APPLIED. - Kirk L. Warner (kwarner)
Viewed: 1700 times.
09.09.07 - KIRK WARNER HAS MADE THE PIECES TO HOLD THE RIGHT WINDOW PANE IN PLACE. THE WINDOW GLASS IS NOW GASKETED, SECURED AND THE FRAME IS PAINTED, WITH A FIRST COAT OF FINISH PAINT, TO COMPLETE THE EXTERIOR OF THE RIGHT SIDE WINDOW. - Kirk L. Warner (kwarner)