| | | |
|
|
|
|
Crown sheet showing stays and front seam - Nigel Bennett (nbennett) Viewed: 2164 times.
|
Firebox side stays - Nigel Bennett (nbennett) Viewed: 2027 times.
|
Removing top of the dome - First slide onto pallet - Nigel Bennett (nbennett) Viewed: 2036 times.
|
Removing top of the dome - The gently lower - Nigel Bennett (nbennett) Viewed: 1899 times.
|
| | | |
| | | |
|
|
|
|
The dome cover - a pretty solid lump of steel - Nigel Bennett (nbennett) Viewed: 1882 times.
|
Brian needle chipping the firebox - Nigel Bennett (nbennett) Viewed: 1915 times.
|
Pipework to be tested - Nigel Bennett (nbennett) Viewed: 1871 times.
|
Firebox seam after sand blasting - Nigel Bennett (nbennett) Viewed: 1894 times.
|
| | | |
| | | |
|
|
|
|
First test bending of the patch - Nigel Bennett (nbennett) Viewed: 1862 times.
|
Rigged for sand blasting - Nigel Bennett (nbennett) Viewed: 1842 times.
|
Sand blasting in progress - Nigel Bennett (nbennett) Viewed: 1843 times.
|
Collin emerges from the boiler - Nigel Bennett (nbennett) Viewed: 1799 times.
|
| | | |
| | | |
|
|
|
|
Rear boiler course now cleaned - Nigel Bennett (nbennett) Viewed: 1896 times.
|
Front tube sheet sheathed for cleaning - Nigel Bennett (nbennett) Viewed: 1880 times.
|
Tubes as recieved back from sand blasting - Nigel Bennett (nbennett) Viewed: 1809 times.
|
Tubes coated with Apexior - Nigel Bennett (nbennett) Viewed: 1828 times.
|
| | | |
| | | |
|
|
|
|
Tube end clean cut for refitting - Nigel Bennett (nbennett) Viewed: 1790 times.
|
Super heater flues still to be clean cut - Nigel Bennett (nbennett) Viewed: 1843 times.
|
Flues now ready for safe ending - Nigel Bennett (nbennett) Viewed: 1835 times.
|
Sand removal - Not pretty but it works! - Nigel Bennett (nbennett) Viewed: 1855 times.
|
| | | |