| | | |
|
|
|
|
|
About 200 pounds of material removed - and 600 to go! - Nigel Bennett (nbennett) Viewed: 2108 times.
|
Mike preparing the mud ring for welding - Nigel Bennett (nbennett) Viewed: 2243 times.
|
Firebox crown sheet seam - Nigel Bennett (nbennett) Viewed: 2093 times.
|
Front tube sheet - Nigel Bennett (nbennett) Viewed: 2174 times.
|
| | | |
| | | |
|
|
|
|
|
Cutting a super heater flue - Nigel Bennett (nbennett) Viewed: 2110 times.
|
All cut and ready for painting - Nigel Bennett (nbennett) Viewed: 2097 times.
|
Drilling the rivet holes - Very carefully !! - Nigel Bennett (nbennett) Viewed: 2170 times.
|
Fireman's side looking back to inner firebox - Nigel Bennett (nbennett) Viewed: 2192 times.
|
| | | |
| | | |
|
|
|
|
|
Fireman's side looking forward to front tube sheet - Nigel Bennett (nbennett) Viewed: 2113 times.
|
View forward showing tube sheet braces and dry pipe - Nigel Bennett (nbennett) Viewed: 2093 times.
|
Boiler barrel clean and open again - Nigel Bennett (nbennett) Viewed: 2015 times.
|
All this came out of the boiler - Nigel Bennett (nbennett) Viewed: 2112 times.
|
| | | |
| | | |
|
|
|
|
|
Looking more like a locomtive again - Nigel Bennett (nbennett) Viewed: 2067 times.
|
The back sheet now clean and ready for inspection - Nigel Bennett (nbennett) Viewed: 2055 times.
|
Progress in testing the stays. Eash one marked has been cleaned and tested - Nigel Bennett (nbennett) Viewed: 2076 times.
|
Making good the rivet holes for the patch - Nigel Bennett (nbennett) Viewed: 2071 times.
|
| | | |
| | | |
|
|
|
|
|
Preparing the tube sheet to receive new tubes - Nigel Bennett (nbennett) Viewed: 2050 times.
|
1630 is moved out of the shop April 2012 - Nigel Bennett (nbennett) Viewed: 2594 times.
|
Throttle body in situ (but rigged ready to lift) - Nigel Bennett (nbennett) Viewed: 2149 times.
|
Lifting out the throttle body - Nigel Bennett (nbennett) Viewed: 2524 times.
|
| | | |