| | | |
|
|
|
|
About 200 pounds of material removed - and 600 to go! - Nigel Bennett (nbennett) Viewed: 1795 times.
|
Mike preparing the mud ring for welding - Nigel Bennett (nbennett) Viewed: 1855 times.
|
Firebox crown sheet seam - Nigel Bennett (nbennett) Viewed: 1782 times.
|
Front tube sheet - Nigel Bennett (nbennett) Viewed: 1856 times.
|
| | | |
| | | |
|
|
|
|
Cutting a super heater flue - Nigel Bennett (nbennett) Viewed: 1785 times.
|
All cut and ready for painting - Nigel Bennett (nbennett) Viewed: 1737 times.
|
Drilling the rivet holes - Very carefully !! - Nigel Bennett (nbennett) Viewed: 1850 times.
|
Fireman's side looking back to inner firebox - Nigel Bennett (nbennett) Viewed: 1891 times.
|
| | | |
| | | |
|
|
|
|
Fireman's side looking forward to front tube sheet - Nigel Bennett (nbennett) Viewed: 1782 times.
|
View forward showing tube sheet braces and dry pipe - Nigel Bennett (nbennett) Viewed: 1774 times.
|
Boiler barrel clean and open again - Nigel Bennett (nbennett) Viewed: 1724 times.
|
All this came out of the boiler - Nigel Bennett (nbennett) Viewed: 1772 times.
|
| | | |
| | | |
|
|
|
|
Looking more like a locomtive again - Nigel Bennett (nbennett) Viewed: 1764 times.
|
The back sheet now clean and ready for inspection - Nigel Bennett (nbennett) Viewed: 1733 times.
|
Progress in testing the stays. Eash one marked has been cleaned and tested - Nigel Bennett (nbennett) Viewed: 1752 times.
|
Making good the rivet holes for the patch - Nigel Bennett (nbennett) Viewed: 1769 times.
|
| | | |
| | | |
|
|
|
|
Preparing the tube sheet to receive new tubes - Nigel Bennett (nbennett) Viewed: 1756 times.
|
1630 is moved out of the shop April 2012 - Nigel Bennett (nbennett) Viewed: 2257 times.
|
Throttle body in situ (but rigged ready to lift) - Nigel Bennett (nbennett) Viewed: 1831 times.
|
Lifting out the throttle body - Nigel Bennett (nbennett) Viewed: 2172 times.
|
| | | |