| | | |
|
|
|
|
|
About 200 pounds of material removed - and 600 to go! - Nigel Bennett (nbennett) Viewed: 2093 times.
|
Mike preparing the mud ring for welding - Nigel Bennett (nbennett) Viewed: 2229 times.
|
Firebox crown sheet seam - Nigel Bennett (nbennett) Viewed: 2079 times.
|
Front tube sheet - Nigel Bennett (nbennett) Viewed: 2165 times.
|
| | | |
| | | |
|
|
|
|
|
Cutting a super heater flue - Nigel Bennett (nbennett) Viewed: 2097 times.
|
All cut and ready for painting - Nigel Bennett (nbennett) Viewed: 2084 times.
|
Drilling the rivet holes - Very carefully !! - Nigel Bennett (nbennett) Viewed: 2155 times.
|
Fireman's side looking back to inner firebox - Nigel Bennett (nbennett) Viewed: 2181 times.
|
| | | |
| | | |
|
|
|
|
|
Fireman's side looking forward to front tube sheet - Nigel Bennett (nbennett) Viewed: 2100 times.
|
View forward showing tube sheet braces and dry pipe - Nigel Bennett (nbennett) Viewed: 2082 times.
|
Boiler barrel clean and open again - Nigel Bennett (nbennett) Viewed: 2004 times.
|
All this came out of the boiler - Nigel Bennett (nbennett) Viewed: 2099 times.
|
| | | |
| | | |
|
|
|
|
|
Looking more like a locomtive again - Nigel Bennett (nbennett) Viewed: 2057 times.
|
The back sheet now clean and ready for inspection - Nigel Bennett (nbennett) Viewed: 2046 times.
|
Progress in testing the stays. Eash one marked has been cleaned and tested - Nigel Bennett (nbennett) Viewed: 2064 times.
|
Making good the rivet holes for the patch - Nigel Bennett (nbennett) Viewed: 2059 times.
|
| | | |
| | | |
|
|
|
|
|
Preparing the tube sheet to receive new tubes - Nigel Bennett (nbennett) Viewed: 2041 times.
|
1630 is moved out of the shop April 2012 - Nigel Bennett (nbennett) Viewed: 2584 times.
|
Throttle body in situ (but rigged ready to lift) - Nigel Bennett (nbennett) Viewed: 2140 times.
|
Lifting out the throttle body - Nigel Bennett (nbennett) Viewed: 2513 times.
|
| | | |