The smokebox is now ready for new bolts - Nigel Bennett (nbennett) Viewed: 1829 times.
|
All flexi stays to be tseted are now marked - Nigel Bennett (nbennett) Viewed: 1862 times.
|
Debris collects in the socket of the stay - Nigel Bennett (nbennett) Viewed: 1763 times.
|
So the socket must be cleaned before testing - Nigel Bennett (nbennett) Viewed: 1708 times.
|
| | | |
| | | |
|
|
|
|
|
Superheater element bolts before - Nigel Bennett (nbennett) Viewed: 1692 times.
|
and after cleaning and checking - Nigel Bennett (nbennett) Viewed: 1756 times.
|
Glenn turns the taper on a safe end - Nigel Bennett (nbennett) Viewed: 1709 times.
|
Ed works on the new lubricator piping - Nigel Bennett (nbennett) Viewed: 1722 times.
|
| | | |
| | | |
|
|
|
|
|
First two flues now safe ended - Nigel Bennett (nbennett) Viewed: 1702 times.
|
Motion brackets now cleaned for repainting - Nigel Bennett (nbennett) Viewed: 1815 times.
|
Cylinders now well under way - Nigel Bennett (nbennett) Viewed: 1742 times.
|
Boiler insulation stored ready to install - Nigel Bennett (nbennett) Viewed: 1763 times.
|
| | | |
| | | |
|
|
|
|
|
Test patch reinforced for bending - Nigel Bennett (nbennett) Viewed: 1760 times.
|
Setting the patch in the press - Nigel Bennett (nbennett) Viewed: 1744 times.
|
Fetching the first new tubes into the shop - Nigel Bennett (nbennett) Viewed: 1727 times.
|
Swaging set up ready to go - Nigel Bennett (nbennett) Viewed: 1754 times.
|
| | | |
| | | |
|
|
|
|
|
First 24 new tubes now swaged - Nigel Bennett (nbennett) Viewed: 1771 times.
|
Swaging area now in full use - Nigel Bennett (nbennett) Viewed: 1703 times.
|
New pipework in place along the boiler - Nigel Bennett (nbennett) Viewed: 1724 times.
|
Set up for cutting ferrules - Nigel Bennett (nbennett) Viewed: 1787 times.
|
| | | |