| | | |
|
|
|
|
The smokebox is now ready for new bolts - Nigel Bennett (nbennett) Viewed: 1725 times.
|
All flexi stays to be tseted are now marked - Nigel Bennett (nbennett) Viewed: 1687 times.
|
Debris collects in the socket of the stay - Nigel Bennett (nbennett) Viewed: 1651 times.
|
So the socket must be cleaned before testing - Nigel Bennett (nbennett) Viewed: 1602 times.
|
| | | |
| | | |
|
|
|
|
Superheater element bolts before - Nigel Bennett (nbennett) Viewed: 1595 times.
|
and after cleaning and checking - Nigel Bennett (nbennett) Viewed: 1654 times.
|
Glenn turns the taper on a safe end - Nigel Bennett (nbennett) Viewed: 1613 times.
|
Ed works on the new lubricator piping - Nigel Bennett (nbennett) Viewed: 1603 times.
|
| | | |
| | | |
|
|
|
|
First two flues now safe ended - Nigel Bennett (nbennett) Viewed: 1594 times.
|
Motion brackets now cleaned for repainting - Nigel Bennett (nbennett) Viewed: 1628 times.
|
Cylinders now well under way - Nigel Bennett (nbennett) Viewed: 1635 times.
|
Boiler insulation stored ready to install - Nigel Bennett (nbennett) Viewed: 1599 times.
|
| | | |
| | | |
|
|
|
|
Test patch reinforced for bending - Nigel Bennett (nbennett) Viewed: 1640 times.
|
Setting the patch in the press - Nigel Bennett (nbennett) Viewed: 1631 times.
|
Fetching the first new tubes into the shop - Nigel Bennett (nbennett) Viewed: 1610 times.
|
Swaging set up ready to go - Nigel Bennett (nbennett) Viewed: 1644 times.
|
| | | |
| | | |
|
|
|
|
First 24 new tubes now swaged - Nigel Bennett (nbennett) Viewed: 1675 times.
|
Swaging area now in full use - Nigel Bennett (nbennett) Viewed: 1590 times.
|
New pipework in place along the boiler - Nigel Bennett (nbennett) Viewed: 1621 times.
|
Set up for cutting ferrules - Nigel Bennett (nbennett) Viewed: 1677 times.
|
| | | |