| | | |
|
|
|
|
The smokebox is now ready for new bolts - Nigel Bennett (nbennett) Viewed: 1684 times.
|
All flexi stays to be tseted are now marked - Nigel Bennett (nbennett) Viewed: 1636 times.
|
Debris collects in the socket of the stay - Nigel Bennett (nbennett) Viewed: 1617 times.
|
So the socket must be cleaned before testing - Nigel Bennett (nbennett) Viewed: 1566 times.
|
| | | |
| | | |
|
|
|
|
Superheater element bolts before - Nigel Bennett (nbennett) Viewed: 1553 times.
|
and after cleaning and checking - Nigel Bennett (nbennett) Viewed: 1619 times.
|
Glenn turns the taper on a safe end - Nigel Bennett (nbennett) Viewed: 1577 times.
|
Ed works on the new lubricator piping - Nigel Bennett (nbennett) Viewed: 1569 times.
|
| | | |
| | | |
|
|
|
|
First two flues now safe ended - Nigel Bennett (nbennett) Viewed: 1558 times.
|
Motion brackets now cleaned for repainting - Nigel Bennett (nbennett) Viewed: 1594 times.
|
Cylinders now well under way - Nigel Bennett (nbennett) Viewed: 1596 times.
|
Boiler insulation stored ready to install - Nigel Bennett (nbennett) Viewed: 1561 times.
|
| | | |
| | | |
|
|
|
|
Test patch reinforced for bending - Nigel Bennett (nbennett) Viewed: 1607 times.
|
Setting the patch in the press - Nigel Bennett (nbennett) Viewed: 1596 times.
|
Fetching the first new tubes into the shop - Nigel Bennett (nbennett) Viewed: 1574 times.
|
Swaging set up ready to go - Nigel Bennett (nbennett) Viewed: 1609 times.
|
| | | |
| | | |
|
|
|
|
First 24 new tubes now swaged - Nigel Bennett (nbennett) Viewed: 1644 times.
|
Swaging area now in full use - Nigel Bennett (nbennett) Viewed: 1558 times.
|
New pipework in place along the boiler - Nigel Bennett (nbennett) Viewed: 1586 times.
|
Set up for cutting ferrules - Nigel Bennett (nbennett) Viewed: 1642 times.
|
| | | |