Illinois Railway Museum Home Page
 BLOG | DIRECTIONS | SCHEDULE | STORE |
   
 
 Passenger-Car-Blog-Posts 
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Gorilla Glue applied to laminate and clamped
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Trim fully installed
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic installing new trim in TV area
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Snow bank so high the mailbox is flagged
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Our department photographer, Jon Habegger
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Gorilla Glue applied to laminate and clamped - Pauline Trabert (trabert)
Viewed: 13 times.
Trim fully installed - Pauline Trabert (trabert)
Viewed: 12 times.
Mike Baksic installing new trim in TV area - Pauline Trabert (trabert)
Viewed: 13 times.
Snow bank so high the mailbox is flagged - Pauline Trabert (trabert)
Viewed: 18 times.
Our department photographer, Jon Habegger - Pauline Trabert (trabert)
Viewed: 12 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike and Kevin removing metal from door
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Roof separation areas epoxied for strength
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Buzz Morisette looking up at his work
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Hip sanded, ready to be primed and painted
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Metal strips every 12' in the Ely
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Mike and Kevin removing metal from door - Pauline Trabert (trabert)
Viewed: 11 times.
Roof separation areas epoxied for strength - Pauline Trabert (trabert)
Viewed: 11 times.
Buzz Morisette looking up at his work - Pauline Trabert (trabert)
Viewed: 12 times.
Hip sanded, ready to be primed and painted - Pauline Trabert (trabert)
Viewed: 11 times.
Metal strips every 12' in the Ely - Pauline Trabert (trabert)
Viewed: 8 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Looking toward the berths
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Notes on Ely ceiling boards left by Buzz Morisette
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike and Shelly apply a vent cover to the new opening
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Vent opening cut as seen from inside the furnace nook
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mark has finished cabinet removal
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Looking toward the berths - Pauline Trabert (trabert)
Viewed: 10 times.
Notes on Ely ceiling boards left by Buzz Morisette - Pauline Trabert (trabert)
Viewed: 10 times.
Mike and Shelly apply a vent cover to the new opening - Pauline Trabert (trabert)
Viewed: 7 times.
Vent opening cut as seen from inside the furnace nook - Pauline Trabert (trabert)
Viewed: 8 times.
Mark has finished cabinet removal - Pauline Trabert (trabert)
Viewed: 8 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike cutting one of the vent openings
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mark removing the remainder of the cabinet
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Cabinet without legs
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mark Gellman removing cabinet legs
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Shelly Vanderschaegen continues baseboard cleanup
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Mike cutting one of the vent openings - Pauline Trabert (trabert)
Viewed: 9 times.
Mark removing the remainder of the cabinet - Pauline Trabert (trabert)
Viewed: 9 times.
Cabinet without legs - Pauline Trabert (trabert)
Viewed: 8 times.
Mark Gellman removing cabinet legs - Pauline Trabert (trabert)
Viewed: 7 times.
Shelly Vanderschaegen continues baseboard cleanup - Pauline Trabert (trabert)
Viewed: 9 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
The former cabinet to the left of the furnace
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Mike Baksic measuring for a vent opening
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Kevin removing the high spots in the vestibule
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Kevin Kriebs in the vestibule
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Front to back: new, refinished, and original finish trim
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
The former cabinet to the left of the furnace - Pauline Trabert (trabert)
Viewed: 8 times.
Mike Baksic measuring for a vent opening - Pauline Trabert (trabert)
Viewed: 9 times.
Kevin removing the high spots in the vestibule - Pauline Trabert (trabert)
Viewed: 8 times.
Kevin Kriebs in the vestibule - Pauline Trabert (trabert)
Viewed: 11 times.
Front to back: new, refinished, and original finish trim - Pauline Trabert (trabert)
Viewed: 18 times.
Powered by Gallery.
Copyright © 1995-2014, Illinois Railway Museum. All rights reserved. Last Modified: 05/11/10 11:20:24 PM